Key Benefits
In some cases, environmental permits require all mooring elements to be removed, including the anchor. EOM Offshore’s anchor recovery system is the solution. Inside the frame of the anchor recovery system is an acoustic release. Under command, the release is triggered, freeing a line from the line spool. This line is then used to recover the mooring and haul back the anchor.
Features:
Up to 25-hour mission duration
Speeds up to 4.2 knots
Increased module payload capacity
Search and recovery
Hydrography
Deep sea mineral exploration
Marine & Fisheries research
EOM Offshore's universal joints are versatile and may be used directly under surface buoys, as interfaces to subsurface buoys, and between mooring risers and seafloor structures.
Read moreAdvanced mooring technology to protect the environment with the advantage of a smaller watch circle and mooring versatility for water depth and load bearing.
Read moreEOM Offshore’s electromechanical (EM) chain visually resembles the stretch hose, and it too can deliver fixed, real-time measurements and power.
Read moreSRS FUSION: A Hybrid ROV Built for the Demands of Modern Marine Operations
Dive deeper, faster, smarter—SRS FUSION In an era where underwater data is critical to infrastructure, defence, and environmental stewardship, the SRS FUSION ROV emerges as a versatile, high-performance solution...
Read MoreBlueZone Group Sharpens Product Expertise at TMTW
Riding the Wave of our 25-year Celebration, BlueZone Group Dives into a Packed Season of Innovation and Industry Engagement Fresh of the back of the success of our 25-year...
Read MoreEngineering Excellence in Action: A Day with NU Teams
This month, BlueZone Group had the pleasure of spending a day with NU Teams—the University of Newcastle’s professional engineering student organisation. NU Teams is comprised of three dynamic, competition-driven groups:...
Read More