Key Benefits
In some cases, environmental permits require all mooring elements to be removed, including the anchor. EOM Offshore’s anchor recovery system is the solution. Inside the frame of the anchor recovery system is an acoustic release. Under command, the release is triggered, freeing a line from the line spool. This line is then used to recover the mooring and haul back the anchor.
Features:
Up to 25-hour mission duration
Speeds up to 4.2 knots
Increased module payload capacity
Search and recovery
Hydrography
Deep sea mineral exploration
Marine & Fisheries research
EOM Offshore's universal joints are versatile and may be used directly under surface buoys, as interfaces to subsurface buoys, and between mooring risers and seafloor structures.
Read moreAdvanced mooring technology to protect the environment with the advantage of a smaller watch circle and mooring versatility for water depth and load bearing.
Read moreEOM Offshore's Multi-Function Node enables a multiple instrumentation configuration. The Multi-Function Node is designed for positive buoyancy. The Multi-Function Node is assembled at EOM Offshore's facility with our integrated anchor...
Read moreAhead of the Tide: A Year of Milestones and Momentum- A Letter from the Director
By Neil Hodges, Managing Director, BlueZone Group As 2025 draws to a close, it’s a moment to reflect on a year that has been nothing short of transformative for...
Read MoreGlobal Journeys, Fresh Faces and Capability Growth That Sets the Stage for the Future For BlueZone Group, 2025 has been nothing short of transformative — a year defined by...
Read MoreSafer Summers: Innovation Beneath the Waves with ArtemisSAR and StarFish
The Advanced Sonar Systems Giving Surf Life Savers the Tools to Protect Lives with Greater Speed, Safety, and Confidence As we turn the page into Aussie summer, the rhythm...
Read More