Riverboat Communication Project

Riverboat Communication Project

Riverboat Communication Project

UVS was pleased to assist the Department of Natural Resources of the Northern Territory Government in the design and manufacture of a communication system for a novel tethered riverboat. The riverboat mounted Teledyne RDI Workhorse instruments and enabled a hydrographer to perform flow measurements from bridges, cableways or manned boats.

UVS has the experience and capability to assist many customers with the design and manufacture of special projects. Our engineering team includes electrical and mechanical design capability. Our workshops support construction of electronic projects and we have trusted suppliers who can provide mechanical components to meet the needs of projects from rivers to ocean depths. Our specialised Polyurethane Moulding Service is ideal for short run production of moulded cable assemblies that are proven to work in harsh environments.

Riverboat Communication Project 

 

Please read more about the Riverboat Communication Project in the attached document.

Riverboat Communication Project Riverboat Communication Project (636 KB)

 


REMUS M3V – Micro 300m UUV

REMUS M3V – Micro 300m UUV

REMUS M3V – Micro 300m UUV Sonobuoy A-size UUVs enable an accelerated MCM timeline Mine Counter Measures (MCM) phases of Detection, Classification and Identification can be constrained by the availability

Read More »
Perth Adds Live Pressure Testing

Perth Adds Live Pressure Testing

Perth Adds Live Pressure Testing Assuring High Quality Cable Assembly Delivery The existing hydrostatic pressure test capability at the BlueZone Perth facility has been improved with the addition of the

Read More »
BlueZone Group Consolidates

BlueZone Group Consolidates

BlueZone Group Consolidates BlueZone Group CEO, Neil Hodges, today announced that BlueZone Group would consolidate all activities of ATSA Defence Services and UVS under the BlueZone Group banner. “We have

Read More »